Economy & Banking📍 National
Green Energy Corridor
Green Energy Corridor Phase III (GEC-III)
A ₹1.86 lakh crore grid transmission scheme to evacuate 40+ GW of renewable electricity into the National Grid.
1. Core Identification & Concept (Pointwise)
- An ambitious Inter-State (ISTS) and Intra-State (InSTS) transmission infrastructure project.
- Approved by the Cabinet Committee on Economic Affairs (CCEA) with a ₹1.86 lakh crore outlay.
- Evacuates renewable energy from high-potential solar, wind, and offshore hubs (Ladakh, Rajasthan, Gujarat, Tamil Nadu).
- Essential for achieving India's target of 500 GW of non-fossil electricity capacity by 2030.
2. Genesis, Headquarters & Governance
Established / Genesis
Phase I (2015-16) / Phase III Approved 2026
Headquarters
New Delhi
Nodal Ministry / Parent Body
Ministry of Power & Ministry of New and Renewable Energy (MNRE)
3. Strategic Mandate & Key Objectives
- Evacuate over 40 gigawatts (GW) of renewable power into the synchronized National Power Grid.
- Build high-voltage direct current (HVDC) lines, digital sub-stations, and dynamic reactive compensators.
- Facilitate green hydrogen production and power export across regional load centres.
4. Historical Milestones & Major Achievements
- 2015: Inception of Green Energy Corridor Phase I for RE-rich states.
- 2022: Cabinet approval for GEC Phase II with central financial assistance.
- September/October 2026: CCEA approval for GEC Phase III with ₹1.86 lakh crore outlay.
5. High-Yield Exam Takeaways & Key Facts
- Financial Outlay: ₹1.86 lakh crore cleared by CCEA.
- Capacity: Integration of 40+ GW of solar and wind generation.
- Executing Utilities: CTUIL, POWERGRID, and State Transmission Utilities (STUs).
- Climate Benchmark: Direct operational pillar for 500 GW non-fossil fuel capacity by 2030.